semi OT, not quite an ad...
It's great when a plan comes together. I just received an order for aluminum plate that I made on Tuesday. Almost 40 pieces, 7 different sizes, 50+ lbs of material, UPS ground shipping. Place up in Bay Shore, NY called metalconnections - ran into them on eBay, and I've used them once before for the same order. Turned out that the material was already loaded on the cutter, so they cut and shipped the same day.
Of course, the downside is that now the pressure is on me, and I can't blame delays in the testset build on "waiting for material".
I need to find that list of excuses and practice saying them to the boss...
Science. If you don't understand it, don't talk to me about how it's going to end the world.