Thread: OT-Min height for hanging main power feed

  1. #1
    Join Date
    Aug 2005
    Location
    Clinton, LA
    Posts
    174

    Default OT-Min height for hanging main power feed

    Anybody know what the code minimum height is for a hanging main power feed line to a weatherhead?

    Thanks, Cadwiz

  2. #2
    Join Date
    Sep 2006
    Location
    grand rapids Mi
    Posts
    1,343

    Default

    think it mostly depends on location, up here the weatherhead had to be 14 feet from ground last time I installed one

    other odd rules came into play depending on the particular location of the weatherhead itself, can't be placed so as to route wires near windows etc.

    Ken.

  3. #3
    Join Date
    Aug 2005
    Location
    Clinton, LA
    Posts
    174

    Default Thanks

    Mine's a tad under 9ft and I want the power company to fix it. I thought it should higher than 9.

    Cadwiz

  4. #4
    Join Date
    Jun 2003
    Location
    Columbus, Ohio
    Posts
    2,349

    Default

    In general, that is to say - I dont know your exact situation, but in general the code is something like this. 225.18 Wire is to be hung not less than 10' over any area where there is foot traffic (yard, sidewalk, etc) 12' for a driveway and 18' for the road (truck traffic).

    Then, there is clearance over a roof - 8' min. Except, a roof with a slope of more than 4-12 is allowed 3'. And a service drop not over 300V..... And a clearance of 3' from any window..... and 18" from mast head to roof..... and 10' to bottom of drip loop...... and, and, and.......

    This is all kind of general. The problem is that the code is complex but not impossible. I think your best bet is to read this section a bit and see how it pertains to your situation.

    Also, call your local code folks. Ours are good about answering the questions.

    Check this link for the NEC online.

    http://bbs.homeshopmachinist.net/showthread.php?t=24668

    Good luck.
    rock-
    Civil engineers build targets, Mechanical engineers build weapons.

  5. #5
    Join Date
    Dec 2004
    Location
    Western New York U.$.A
    Posts
    7,266

    Default

    Quote Originally Posted by rockrat
    ......Also, call your local code folks. Ours are good about answering the questions. ..........
    -
    Actually, from my experiance I'd ask one inspector how he wants it done and then note his name. The codes are sometimes so difficult the inspectors can't agree amoungst themselves how they want it done.
    - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
    Thank you to our families of soldiers, many of whom have given so much more then the rest of us for the Freedom we enjoy.

    It is true, there is nothing free about freedom, don't be so quick to give it away.

  6. #6
    Join Date
    Feb 2005
    Posts
    325

    Default

    When I did one, I called the power company. Each state has their own rules.
    Weather head and direction the meter base must face as well as ground. I know that Miss. and Ky. are different. the power company faxed me a copy of their requirements.
    re
    Herm Williams

  7. #7
    Join Date
    Jun 2005
    Location
    Almost Dallas
    Posts
    1,253

    Default

    When I built a garage to be equipped with it's own power drop in 2001, I contacted the power company and their engineer gave me a booklet showing all of the dimensions and requirements for the service connections, meter height, wire gauge, etc. It was easy to understand, and best of all, came straight from the "horses mouth."

    Later on, getting the service connected went without a hitch.

  8. #8
    Join Date
    Nov 2007
    Location
    Wenatchee, Washington USA
    Posts
    462

    Default

    Definately check with your local inspection authority and/or power company. Requirements may be diferent in various locations and circumstances. Here in Central Washington it changes betweed the City and two Counties. All are close, but the city is more restrictive due to city ordinance. Ask and you won't get cought off guard. Also, if this is for a main service from the power company they may have requirements for the wire size that exceeds local codes due to length of run and their transformer size and placement.

    Good Luck,
    Robin