Announcement

Collapse
No announcement yet.

Blowing up a 5000 amp fuse

Collapse
X
 
  • Filter
  • Time
  • Show
Clear All
new posts

  • #46
    Originally posted by Richard P Wilson View Post

    It asks me if I'm over 18 (yes) and do I want to see adult content. What in the world are they doing? Adult content? Anyway, I'm not opening it, not having any record that I've been watching 'adult content' on my PC
    You do you.

    Comment


    • #47
      Originally posted by MichaelP View Post
      I wonder if all this really belongs to a machining forum... First we're invited to see sutured hands, now we are enjoying vaporized bodies... Do we really need to continue? How about someone showing a photo of his hemorrhoids being fixed? Or a colonoscopy video?
      Videos that demonstrate what can go wrong in the name of safety? They most definitely belong in a machinist forum.

      Comment


      • #48
        Originally posted by Arcane View Post


        Ya think!!!
        There is always the option of cutting power to do the work. If you do not have arc flash gear, that's the only way to handle it.
        CNC machines only go through the motions.

        Ideas expressed may be mine, or from anyone else in the universe.
        Not responsible for clerical errors. Or those made by lay people either.
        Number formats and units may be chosen at random depending on what day it is.
        I reserve the right to use a number system with any integer base without prior notice.
        Generalizations are understood to be "often" true, but not true in every case.

        Comment


        • #49
          Originally posted by J Tiers View Post

          There is always the option of cutting power to do the work. If you do not have arc flash gear, that's the only way to handle it.
          Exactly! A power outage is an inconvenience to some people but it can be the difference between life and death to others who have to do the actual work.

          I remember back when we had an insulator crack on the overhead 25Kv bus work that fed several three phase feeders in one of our 72/25 Kv substations. This was a big crack, totally through the insulator and when it was removed, it was in two pieces. It was also over speced for the working voltage being for 34.5 Kv IIRC. Our supervisor asked my crew foreman if we would do the replacement hot and he flat out and out refused, knowing there was no way to guarantee there couldn't be a flashover. (It was SOP to use a bucket truck with an insulated boom and insulated bucket liners and 40Kv insulated rubber gloves to work on 25Kv lines when we KNEW it was safe to do so.) Said supervisor just went to another crew foreman and asked him if they would do it. "Sure! No problem!"

          Well, he got lucky and there was no flashover but if there had been, he would not have survived. The fault current would have been well over 7000 amps at 14,400V (nominal) to ground... I'm not sure if the Lineman in the other bucket would have survived that or not but I'm positive he would have been severely injured.

          We could have switched the load out to other feeders if done very late at night when the load was minimal but the supervisor didn't want to pay anybody OT to do the job.
          Location: Saskatoon, Saskatchewan, Canada

          Comment


          • #50
            Originally posted by Arcane View Post

            Exactly! A power outage is an inconvenience to some people but it can be the difference between life and death to others who have to do the actual work.

            I remember back when we had an insulator crack on the overhead 25Kv bus work that fed several three phase feeders in one of our 72/25 Kv substations. This was a big crack, totally through the insulator and when it was removed, it was in two pieces. It was also over speced for the working voltage being for 34.5 Kv IIRC. Our supervisor asked my crew foreman if we would do the replacement hot and he flat out and out refused, knowing there was no way to guarantee there couldn't be a flashover. (It was SOP to use a bucket truck with an insulated boom and insulated bucket liners and 40Kv insulated rubber gloves to work on 25Kv lines when we KNEW it was safe to do so.) Said supervisor just went to another crew foreman and asked him if they would do it. "Sure! No problem!"

            Well, he got lucky and there was no flashover but if there had been, he would not have survived. The fault current would have been well over 7000 amps at 14,400V (nominal) to ground... I'm not sure if the Lineman in the other bucket would have survived that or not but I'm positive he would have been severely injured.

            We could have switched the load out to other feeders if done very late at night when the load was minimal but the supervisor didn't want to pay anybody OT to do the job.
            I'll stick to 240v

            Comment


            • #51
              Originally posted by Arcane View Post

              ......................
              .................
              We could have switched the load out to other feeders if done very late at night when the load was minimal but the supervisor didn't want to pay anybody OT to do the job.
              Damn!
              Crap like this pisses me off!
              That A-hole supervisor will gamble somebody else's life, not his own, in order to get the job done in a timely and cost efficient manner so that he looks good.
              They all want you to be a team player but when the sh*t hits the fan they'll all point their fingers to the guy that can't talk anymore! He's had all of the training and signed multiple forms testifying so, we have it all on file.

              Been in all too many similar scenarios.
              Home, down in the valley behind the Red Angus
              Bad Decisions Make Good Stories​

              Location: British Columbia

              Comment


              • #52
                Originally posted by Michael Edwards View Post

                That was an epic blunder. All of that money spent on equipment and they just took a guess on the weight of the explosives. Another couple hundred bucks for a scale and this would not have happened.
                Scary proposition, as I have noticed how far off human perception of things like weight and dimension can be from person to person.
                I just need one more tool,just one!

                Comment


                • #53
                  Originally posted by PStechPaul View Post
                  ..............................................

                  In the course of designing and building electrical test equipment, I watched a film made by Bussmann Fuse Company, that showed full power destructive testing of low voltage (600 V) switchgear, and it showed how a molded case circuit breaker would typically be destroyed even when successfully clearing an overcurrent fault within its interrupting rating (typically 5,000 - 20,000 amp), whereas a similarly rated fuse would just quietly break the circuit with a puff of smoke. It might exhibit more damage at its interrupting rating of 100,000 to 200,000 amps, but the fault was still cleared without much drama.
                  Down the street from me there is a house that had a power cross to the 4160 volt feeder. The feeder has a fuse at the end of the block, size not known to me for sure, but I was told on the order of 100A, which seems reasonable given the area it supplies. The fuses are of the bare wire type, stretched over spring prongs in a ceramic housing. Probably not particularly fast fuses, not current limiting.

                  A tree fell, knocking one phase of the feeder onto the house drop, and onto the ground as well. I saw the results. The breaker box looked like a bomb went off in it. The mains and some of the branch breakers were hanging out the front, burnt. Obviously there had been a substantial arc flash, mostly contained in the box. Several outlets had had flashovers and the wall around them was blackened. I was amazed there had been no fire. pretty much every electrical device or fitting. wire, etc was damaged and it all had to be replaced.

                  All that through a 100A fuse, with part of the available current arcing to ground.
                  CNC machines only go through the motions.

                  Ideas expressed may be mine, or from anyone else in the universe.
                  Not responsible for clerical errors. Or those made by lay people either.
                  Number formats and units may be chosen at random depending on what day it is.
                  I reserve the right to use a number system with any integer base without prior notice.
                  Generalizations are understood to be "often" true, but not true in every case.

                  Comment


                  • #54
                    The details of the incident I described may not be totally correct, as it was probably at least 30 years ago. I have been on several such maintenance jobs and they have been performed during a planned shut-down, but there was usually an auxiliary source of power while the main feed was disconnected. Sometimes we used generators, but they are not quite up to the task of supplying primary injection breaker test sets that use 480 VAC at 200 amps or more. I think the accident occurred on one of the main circuits that could only be shut down at the pole or pad mounted distribution transformer. It may have been a "side job" that avoided the expense of having the electric utility involved. And the wrench might have been at least partially wrapped with electrical tape which is a common safeguard.

                    One of my first jobs with EIL in 1974 was at a huge government facility in Newark, OH. I think a few years later, at the same facility, a technician was seriously injured when he was racking in (or maybe out) when a cluster of contact fingers fell across the bus.
                    http://pauleschoen.com/pix/PM08_P76_P54.png
                    Paul , P S Technology, Inc. and MrTibbs
                    USA Maryland 21030

                    Comment

                    Working...
                    X