I am having all my power lines buried underground. Plus running electricity and water to a couple of buildings and to some pastures. The operator is quite good at hitting his targets. Three men on the crew. The HDD drilling rig, an excavator, a front loader, the support truck that recycles the water. They are only using 5 cubic meters of water for all the drilling. The recycling rig is quite impressive. It consists of a centrifuge and filters to remove the dirt from the water.
To get water to one pasture across the street they drilled under our driveway, under the road, under a bridge on the road and came up about 20 meters from the side of the road along a fence and another road. He missed his spray painted mark b 3cm! I told him he would never get a job in Texas with such sloppy work. He took it the way I meant it and we both had a good laugh.
To get water to one pasture across the street they drilled under our driveway, under the road, under a bridge on the road and came up about 20 meters from the side of the road along a fence and another road. He missed his spray painted mark b 3cm! I told him he would never get a job in Texas with such sloppy work. He took it the way I meant it and we both had a good laugh.
Comment