Can anyone explain to me how, in Mach 3, I can have a Z move control a solenoid.
For example
z-1., solenoid on
z1., solenoid off
My depth of cut can just as easily be controlled with a stop, using a pneumatic cylinder with flow control to control the plunge speed....and then I can use my extra stepper on another project
would it work to just use the direction pin and put it to a 5v relay?
For example
z-1., solenoid on
z1., solenoid off
My depth of cut can just as easily be controlled with a stop, using a pneumatic cylinder with flow control to control the plunge speed....and then I can use my extra stepper on another project
would it work to just use the direction pin and put it to a 5v relay?
Comment