In the County where I work, they do a lot of geo thermals, and it is done by bored wells. Due to space constraints, there could be as many as 20 bored wells for a not so big building. Of course, these holes are bored by a well drilling rig, the loops are grouted in place, piping buried to the building. VERY expensive. But by golly they get those LEED points for it!
I guarantee most of the components will wear out and be replaced before they ever break even on costs.
I guarantee most of the components will wear out and be replaced before they ever break even on costs.
Comment